Take notice that on September 1, 2000, Iroquois Gas Transmission System, L.P. (Iroquois) tendered for filing as part of its FERC Gas Tariff, First Revised Volume No. 1, the following tariff sheets with the proposed effective date of September 1, 2000.
Twenty-Eighth Revised Sheet No. 4
First Revised Sheet No. 84A
Second Revised Sheet No. 88
Third Revised Sheet No. 93A
Fourth Revised Sheet No. 94
Fourth Revised Sheet No. 95
First Revised Sheet No. 95A
Third Revised Sheet No. 96
First Revised Sheet No. 96A
Second Revised Sheet No. 97
Third Revised Sheet No. 102
Third Revised Sheet No. 105
Original Sheet No. 105A
Fourth Revised Sheet No. 106
Second Revised Sheet No. 106A
Third Revised Sheet No. 161
Third Revised Sheet No. 162
Iroquois makes the instant tariff filing to implement the directives of Order Nos. 637 and 637-A regarding the lifting of the rate ceiling for short-term capacity release transactions and certain reporting requirements.
Any person desiring to be heard or to protest said filing should file a motion to intervene or a protest with the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, in accordance with Sections 385.214 or 385.211 of the Commission's Rules and Regulations. All such motions or protests must be filed in accordance with Section 154.210 of the Commission's Regulations. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceedings. Any person wishing to become a party must file a motion to intervene. Copies of this filing are on file with the Commission and are available for public inspection in the Public Reference Room. This filing may be viewed on the web at http://www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance).
David P. Boergers,
Secretary.
[FR Doc. 00-23453 Filed 9-12-00; 8:45 am]
BILLING CODE 6717-01-M