Drawbridge Operation Regulations; Dorchester Bay, MA

Download PDF
Federal RegisterSep 3, 2002
67 Fed. Reg. 56247 (Sep. 3, 2002)

AGENCY:

Coast Guard, DOT.

ACTION:

Notice of proposed rulemaking.

SUMMARY:

The Coast Guard proposes to temporarily change the drawbridge operating regulations governing the operation of the William T. Morrisey Boulevard Bridge, at mile 0.0, across Dorchester Bay at Boston, Massachusetts. This proposed temporary change to the drawbridge operation regulations would allow the bridge to remain in the closed position from November 1, 2002 through May 10, 2003. This action is necessary to facilitate rehabilitation construction at the bridge.

DATES:

Comments must reach the Coast Guard on or before October 3, 2002.

ADDRESSES:

You may mail comments to Commander (obr), First Coast Guard District, Bridge Branch, at 408 Atlantic Avenue, Boston, MA 02110-3350, or deliver them to the same address between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The telephone number is (617) 223-8364. The First Coast Guard District, Bridge Branch, maintains the public docket for this rulemaking. Comments and material received from the public, as well as documents indicated in this preamble as being available in the docket, will become part of this docket and will be available for inspection or copying at the First Coast Guard District, Bridge Branch, 7 a.m. to 3 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT:

Mr. John W. McDonald, Project Officer, First Coast Guard District, (617) 223-8364.

SUPPLEMENTARY INFORMATION:

Request for Comments

We encourage you to participate in this rulemaking by submitting comments or related material. If you do so, please include your name and address, identify the docket number for this rulemaking (CGD01-02-101), indicate the specific section of this document to which each comment applies, and give the reason for each comment. Please submit all comments and related material in an unbound format, no larger than 81/2 by 11 inches, suitable for copying. If you would like to know if they reached us, please enclose a stamped, self-addressed postcard or envelope. We will consider all comments and material received during the comment period. We may change this proposed rule in view of them.

Public Meeting

We do not now plan to hold a public meeting. But you may submit a request for a meeting by writing to the First Coast Guard District, Bridge Branch, at the address under ADDRESSES explaining why one would be beneficial. If we determine that one would aid this rulemaking, we will hold one at a time and place announced by a later notice in the Federal Register.

Regulatory Information

Pursuant to 5 U.S.C. 553, a notice of proposed rulemaking (NPRM) is being published with a shortened comment period of thirty days instead of the normal sixty day comment period because the bridge owner coordinated this closure with the members of the Dorchester Yacht Club, the sole marine facility upstream from the bridge, and the members of the yacht club agreed upon the time period that the bridge will be allowed to remain closed.

The Coast Guard anticipates that any temporary final rule enacted following public notice and comment may be effective in less than 30 days after publication.

Any delay encountered in this regulation's effective date would be unnecessary and contrary to the public interest because the rehabilitation construction is necessary in order to assure continued reliable operation of the bridge.

Background

The William T. Morrisey Boulevard Bridge, at mile 0.0, across Dorchester Bay has a vertical clearance of 12 feet at mean high water and 22 feet at mean low water. The existing regulations at 33 CFR 117.597 require the draw to open on signal from April 16 through October 14; except that, the draw need not open for vessel traffic from 7:30 a.m. to 9 a.m. and from 4:30 p.m. to 6 p.m. except on Saturdays, Sundays, or holidays observed in the locality. From October 15 through April 15, the draw shall open on signal if at least twenty-four hours notice is given.

The bridge owner, the Metropolitan District Commission (MDC), asked the Coast Guard to temporarily change the drawbridge operation regulations to allow the bridge to remain in the closed position from November 1, 2002 through May 10, 2003, to facilitate rehabilitation construction at the bridge. The bridge owner and the Coast Guard contacted all known waterway users to advise them of the proposed closure. No objections or negative comments were received in response this proposal.

Discussion of Proposal

This proposed temporary change to the drawbridge operation regulations would allow the William T. Morrisey Boulevard Bridge to remain in the closed position from November 1, 2002 through May 10, 2003. The bridge normally operates on a twenty-four hour advance notice from October 15 through April 15, during the winter months.

Regulatory Evaluation

This proposed rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866 and does not require an assessment of potential costs and benefits under 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not significant under the regulatory policies and procedures of the Department of Transportation (DOT) (44 FR 11040, Feb. 26, 1979).

We expect the economic impact of this proposed rule to be so minimal that a full Regulatory Evaluation, under paragraph 10e of the regulatory policies and procedures of DOT, is unnecessary. This conclusion is based on the fact that the only marine facility effected by this proposal has agreed to the closure dates for the bridge.

Small Entities

Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we considered whether this proposed rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.

The Coast Guard certifies under section 5 U.S.C. 605(b), that this proposed rule would not have a significant economic impact on a substantial number of small entities. This conclusion is based upon the fact that the only marine facility effected by this proposal has agreed to the closure date for the bridge.

If you think that your business, organization, or governmental jurisdiction qualifies as a small entity and that this rule would have a significant economic impact on it, please submit a comment (see ADDRESSES) explaining why you think it qualifies and how and to what degree this rule would economically affect it.

Collection of Information

This proposed rule would call for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520.).

Federalism

We have analyzed this proposed rule under E.O. 13132 and have determined that this rule does not have implications for federalism under that Order.

Unfunded Mandates Reform Act

The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) governs the issuance of Federal regulations that require unfunded mandates. An unfunded mandate is a regulation that requires a State, local, or tribal government or the private sector to incur direct costs without the Federal Government's having first provided the funds to pay those costs. This proposed rule would not impose an unfunded mandate.

Taking of Private Property

This proposed rule would not effect a taking of private property or otherwise have taking implications under E.O. 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

Civil Justice Reform

This proposed rule meets applicable standards in sections 3(a) and 3(b)(2) of E.O. 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

Protection of Children

We have analyzed this proposed rule under E.O. 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not concern an environmental risk to health or risk to safety that may disproportionately affect children.

Environment

We considered the environmental impact of this proposed rule and concluded that, under figure 2-1, paragraph (32)(e), of Commandant Instruction M16475.1C, this proposed rule is categorically excluded from further environmental documentation because promulgation of drawbridge regulations have been found not to have a significant effect on the environment. A written “Categorical Exclusion Determination” is not required for this rule.

Indian Tribal Governments

This final rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

Energy Effects

We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. It has not been designated by the Administrator of the Office of Information and Regulatory Affairs as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

List of Subjects in 33 CFR Part 117

  • Bridges

Regulations

For the reasons set out in the preamble, the Coast Guard proposes to amend 33 CFR part 117 as follows:

PART 117—DRAWBRIDGE OPERATION REGULATIONS

1. The authority citation for part 117 continues to read as follows:

Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 117.255 also issued under the authority of Pub. L. 102-587, 106 Stat. 5039.

§ 117.597
[Suspended]

2. From November 1, 2002 through May 10, 2003, § 117.597 is suspended.

3. From November 1, 2002 through May 10, 2003, § 117.T602 is temporarily added to read as follows:

§ 117.T602
Dorchester Bay

The draw of the William T. Morrisey Boulevard Bridge, mile 0.0, at Boston, need not open for the passage of vessel traffic.

Dated: August 26, 2002.

V.S. Crea,

Rear Admiral, Coast Guard, Commander, First Coast Guard District.

[FR Doc. 02-22337 Filed 8-30-02; 8:45 am]

BILLING CODE 4910-15-P