Ball Bearings and Parts Thereof From France, Germany, Italy, Japan, and the United Kingdom: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Reviews

Download PDF
Federal RegisterJan 27, 2006
71 Fed. Reg. 4568 (Jan. 27, 2006)

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

January 27, 2006.

FOR FURTHER INFORMATION CONTACT:

Janis Kalnins or Richard Rimlinger, AD/CVD Operations, Office 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone: (202) 482-1392 and (202) 482-4477, respectively.

SUPPLEMENTARY INFORMATION:

Background

At the request of interested parties, the Department of Commerce (the Department) initiated administrative reviews of the antidumping duty orders on antifriction bearings and parts thereof from France, Germany, Italy, Japan, Singapore, and the United Kingdom for the period May 1, 2004, through April 30, 2005. See Initiation of Antidumping and Countervailing Duty Administrative Reviews, 70 FR 37749 (June 30, 2005). On October 21, 2005, we published a notice of rescission and partial rescission of the antidumping duty administrative reviews of ball bearings and parts thereof from Singapore, the United Kingdom, and Japan and of spherical plain bearings from France (70 FR 61251). The preliminary results of the reviews still underway are currently due no later than January 31, 2006.

Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Reviews

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. If it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days after the last day of the anniversary month.

We determine that it is not practicable to complete the preliminary results of these reviews within the original time limit because of the number of respondents in these reviews and the complexity of the issues under analysis. Therefore, we are extending the time period for issuing the preliminary results of these reviews by 30 days until March 2, 2006.

This notice is published in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2).

Dated: January 23, 2005.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

[FR Doc. E6-1056 Filed 1-26-06; 8:45 am]

BILLING CODE 3510-DS-S